language
中国
韩国
韩国
韩国
韩国
韩国
搜索
Search
/
/
/
Fertilizer water management and pruning for good price and quality Red dates

Fertilizer water management and pruning for good price and quality Red dates

  • Categories:Red dates
  • Author:
  • Origin:
  • Time of issue:2022-05-11 08:38
  • Views:

(Summary description)After the saplings are planted, 10 to 15 days before germination in spring, topdress each plant with 1-2 taels of urea and 10 kg of water, and then repeat the operation (irrigation and topdressing) every other month. centimeters.

Fertilizer water management and pruning for good price and quality Red dates

(Summary description)After the saplings are planted, 10 to 15 days before germination in spring, topdress each plant with 1-2 taels of urea and 10 kg of water, and then repeat the operation (irrigation and topdressing) every other month. centimeters.

  • Categories:Red dates
  • Author:
  • Origin:
  • Time of issue:2022-05-11 08:38
  • Views:
Information

How much do you know about fertilizer and water management and shaping and pruning of good price and quality Red dates? Let's have a simple understanding together!
1. Fertilizer and water management
After the saplings are planted, 10 to 15 days before germination in spring, topdress each plant with 1-2 taels of urea and 10 kg of water, and then repeat the operation (irrigation and topdressing) every other month. centimeters.

good price and quality Red dates
2. Plastic trimming
After the jujube is planted, cut off the root sprouts and excess branches, the main trunk is 1.2-1.5 cm thick, and when the secondary branch is 0.8 cm thick, cut off the main trunk at 60-80 cm from the ground, and cut off the first secondary branch. The branches are cut off, and 3 secondary branches with suitable positions are selected and one bud is cut short, so as to promote the formation of the first layer of main branches by the side branches, and then use the same method to cultivate the second and third layers of main branches, and the second layer There are 2 to 3 main branches, 1 to 2 main branches in the third layer, the distance between each layer is 70 to 80 cm, and the main branches of two adjacent layers are staggered and do not overlap each other.
The above is a brief introduction to the knowledge of fertilizer and water management and shaping and pruning about good price and quality Red dates.

Keyword:

Shanghai Dashanhe Edibletechnology Co.,Ltd

A a full-scale industrial chain enterprisespecialized in dried mushroom, fungus anddeep processing products such as mushroombiscuits, seasoning, sauce, pickles and healthcare products related to mushroom.

 

Copyright © Shanghai Dashanhe Edibletechnology Co.,Ltd All Right